Keep scheduling in Movie Magic. Save two of its built-in reports as PDF, the Shooting Schedule and the Breakdown Sheet, and G-Casper Pro rebuilds every shoot day from them with scenes, cast, elements and banners. When the 1st AD revises the board you re-import it, and the call sheet work you have already done stays where it was.
Movie Magic Scheduling 6 and 10 both work, with no custom report template to set up.
The Shooting Schedule gives the order and the days, and the Breakdown Sheet gives what is in each scene, so G-Casper Pro matches the two scene by scene. You need both, because the schedule on its own is missing the elements.
Importing from Movie MagicLunch, Company Move, Setup, Strike and Wrap banners come across with the strips, in the order they sat on your board.
Banner strips from importA five-step wizard puts the old and new schedule side by side, then asks about cast numbers, dropped days, nicknames and the crew DOOD before it writes anything. Each version is saved, so you can go back to it if the new board turns out wrong.
Schedule versioningExport the schedule and breakdown as a USS 1.1.0 file, stripboard and boneyard included, for any tool that reads the Universal Schedule Standard.
Exporting to USSSend the breakdown, the days schedule, the BG list or Exhibit G to a linked Google Sheet and rewrite it as the show changes.
Google Sheets interoperabilityIf the next show runs on something else, USS files from ThinkCrew or Cinapse and G-Casper or Casper spreadsheets come in through the same import.
USS explainedOne upload gives you a call sheet for every shoot day, with scenes, cast assignments and banners already in place. You review each day, adjust what needs adjusting and send.
Import your Shooting Schedule and Breakdown Sheet PDFs from Movie Magic Scheduling 6 or 10
Sample PDFs are ready to select
Scenes that moved follow their new day, while the crew calls you set stay put and your notes and banners carry over.
Scene number, INT or EXT, day or night, pages and set, in shooting order and coloured the way the strips were on the board.
Drag a grip to reorder. Right-click a scene number for the row menu; the chevron turns a row into a banner.
| SCENES | PAGES | SET & DESCRIPTION | D/N | CAST | NOTES | LOCATIONS |
|---|---|---|---|---|---|---|
4 | 2 3/8 | INT. BAILEY HOUSE - KITCHEN Mary tells George about the house. | D1 | 1, 2 | Notes... | Stage 4 |
7 | 1 1/8 | EXT. MAIN STREET George runs past the bank. | D1 | 1 | Notes... | Backlot, Main St. |
12 | 7/8 | EXT. TRAIN STATION - PLATFORM Harry steps off the train. | D2 | 1, 4 | Notes... | Union Station |
15 | 1 4/8 | INT. MARTINI'S BAR George drinks alone. | D2 | 1, 5 | Notes... | Stage 4 |
| TOTAL PAGES | 5 7/8 | |||||
The Shooting Schedule and the Breakdown Sheet, both saved as PDF from Movie Magic Scheduling 6 or 10. They are built-in reports, so there is no custom template to install.
No. The import reads the PDFs, so export the two reports from Movie Magic and upload them together.
Crew call times you already set stay as they are. Cast call times adjust to the new shoot days, and the wizard asks before it drops a day or renumbers cast.
G-Casper Pro is a call sheet tool. It has a stripboard you can reorder and a breakdown you can edit, but the schedule usually lives in Movie Magic or a USS tool and comes in by import.
G-Casper Pro is in private beta. Join the waitlist and get your first 3 shoot days free when access opens.